In order to ascertain a timetable, it is necessary to find out simply how much time must be authorized for loading and unloading the cargo. For example, with the remuneration scheme: do not forget that the shipper has provided two days with the cargo being loaded on the ship, but if one thing is missing or if it requires a whole day to load the com